AI HVAC estimating software for mechanical contractors

An HVAC takeoff turns duct drawings into sizes, lengths, fittings, weight and insulation, then adds equipment, air devices and piping. Garvy measures each run by size, counts every fitting and grille, reads the equipment schedules and builds the proposal the way your company bids.

Get early access

The hard part

Where HVAC takeoffs go wrong

These are the places an HVAC number usually drifts. Garvy is built to catch them or ask about them.

Duct sizes that change mid-run

Every transition changes the size, gauge and weight per foot. Measuring a run as one size is the fastest way to miss sheet metal weight.

Fittings drawn but not counted

Elbows, takeoffs, transitions and offsets each carry labor. They're easy to see and easy to skip when the count is done by hand.

Air devices across plans and schedules

Diffusers, registers and grilles are tagged on the plan and defined in a schedule with neck sizes and CFM. The two have to match.

Insulation and lining by duct type

Supply, return and exhaust each carry different wrap or liner requirements in the spec. That changes square footage and price on the same run.

Equipment tags that don't match the schedule

An RTU or fan on the plan with a tag the schedule doesn't list, or a schedule unit that never appears on a plan.

Controls, TAB and startup

Whether controls, test-and-balance and startup are yours is decided in the specs, not on the sheets.

The takeoff

What Garvy takes off for HVAC and sheet metal contractors

Garvy takes off M-series duct and piping plans, equipment schedules, air device schedules, details and the mechanical legend. Every line is tagged to the sheet it came from.

ItemUnitTaken from
Rectangular and round duct by sizeLF / LBSDuct plans + legend
Fittings (elbows, takeoffs, transitions)EADuct plans
Diffusers, registers and grillesEAPlans + air device schedule
Duct insulation and linerSFDuct takeoff + spec requirements
Equipment (RTUs, AHUs, fans, VAVs)EAEquipment schedules + plans
Hydronic and refrigerant pipingLFPiping plans and details

Beyond your sheets

The specs that change your price

Spec sections are never taken off, but they decide materials, methods and what's in your scope. Garvy reads them and carries what matters into the price and the proposal.

SectionWhat Garvy looks for
23 31 13
Metal ducts
Gauge, pressure class, sealing requirements
23 07 13
Duct insulation
Which duct gets wrapped or lined, and how thick
23 37 13
Diffusers, registers and grilles
Finishes, dampers, approved makes
23 05 93
Testing, adjusting and balancing
Whether TAB is in your scope

No guessing

Questions Garvy raises instead of guessing

When the documents don't answer it, Garvy lists it with the sheet and location. You decide whether to assume or send an RFI.

Duct run with no size called out between two fittings
Equipment tag on the plan that isn't in the equipment schedule
Air device CFM on the plan differs from the schedule
Controls wiring split between mechanical and electrical is unclear

Questions

HVAC estimating with Garvy

Does Garvy calculate sheet metal weight?

Garvy measures duct by size and applies the gauge from your spec's pressure class, so the takeoff carries both length and weight. Your company's weight and labor tables drive the price.

Does Garvy take off piping as well as duct?

Yes, when piping is in your scope. He takes off the sheets that apply to the work you bid and reads the rest for context.

What if the engineer didn't size every run?

Garvy doesn't fill the gap with a guess. He lists the run, the sheet and the location as a question, and you decide whether to assume a size or send an RFI.

New to AI takeoff? Start with how AI estimating software works, including where your estimator reviews and what it can't do yet.

Throw Garvy your next HVAC bid.